Steve Seguis

"Microsoft Windows Server 2008 Administration"

If you have defined
multiple tasks, you can also set the order in which these tasks are executed by using the
up and down arrow buttons at the right of the Actions tab to move each task above or
below another task. The tasks are executed from the top down.
73 Chapter 3: Server Manager
Conditions Tab In addition to the triggers, you can also apply certain conditions to
control execution. If you select Run On Idle on the Triggers tab, you can set the condition
as to how long the computer has to be idle before executing and also whether or not to
stop the task if the computer ceases to be idle. You can also configure the task to run only
if the computer is on AC power and to stop if it suddenly switches to battery power. The
task can also wake the computer to run. It also offers a condition for checking whether
any network connection or a specific network connection is available before continuing.
Settings Tab The Settings tab includes some additional options relating to the behavior
of the task:
?–? Allow the task to be run on demand.
?–  Run the task as soon as possible after a scheduled start is missed.
?–  If the task fails, restart every X time period and set the number of retries.
?–  Stop the task if it runs longer than X time period.
?–  If the task does not end when requested, force it to stop.
?–  If the task is not scheduled to run again, delete it after X time period.